CASTELLBISBAL PRIMARY HEALTH CENTRE ENLARGEMENT AND REFORM
Year
2017-2018
Service
ESTIMATED COST WITH BIM TOOLS, PREPARATION OF TECHNICAL SPECIFICATIONS, SAFETY AND HEALTH STUDY, QUALITY CONTROL PROGRAM, WASTE MANAGEMENT STUDY, AND WORK PLAN (1711)
Work
CASTELLBISBAL PRIMARY HEALTH CENTRE ENLARGEMENT AND REFORM
Location
CASTELLBISBAL
Area
1.031,6 m2
Developer
INFRAESTRUCTURES DE LA GENERALITAT DE CATALUNYA
Project designer
LAVIÑA-DE LA VILLA ARQUITECTURA
Work Contractor
-